Friday, December 21, 2012
Starting AutoCAD Plant 3D
First time using AutoCAD Plant 3D, I can say it is more easier than Catia so far. Maybe cause by all the equipments are in preset 3D model. Knowledge on every equipment are important to ensure the complete system assemble in order.
Sunday, July 1, 2012
Board of Engineer Malaysia
After step by step, follow the procedure, keen on contact the Board of Engineer Malaysia's person in charge, went back to my college...then, this official form in my hand...one step forward for future....
Sunday, June 24, 2012
Friday, November 25, 2011
AFTER 10 MONTHS AS PROJECT ENGINEER...
WATER TREATMENT IN MALAYSIA.
In Malaysia, there are 6 common types of water treatment plant operated in whole state. The types of treatment plant classified by the settling tank used. Mostly, the floc lovo type used in Malaysia, followed by flat bottom and hopper bottom. Then, using high technology, super pulsator also contributes high efficiency to treat water in Malaysia. Recently, in short time to erect, package plant included as an important asset to supply the treated water. A complete package plant in Malaysia included lamella clarifier and dyna sand filter. Beside that, dissolved air flotation (DAF) also used at certain quality of raw water especially dam source of water.
Floc Lovo Clarifier
Hopper Bottom Clarifier
Flat Bottom Clarifier
Super Pulsator
Package Plant (Lamella Clarifier and Dyna Sand Filter)
DAF
Floc Lovo Clarifier
Hopper Bottom Clarifier
Flat Bottom Clarifier
Super Pulsator
DAF
Friday, November 11, 2011
Career begin on 10.01.2011 at a construction company as Project Engineer. Now focusing on Asset Management Project for a government body.
Along build up career, my boss always remind me with a magic phrase, "Maxi mus Your 5 SENSORS"....What is all about?....It is very tedious action....by hook or by crook, just do it....
Saturday, February 19, 2011
LITTLE SIMPLE FIGURE
Subscribe to:
Posts (Atom)